CoyoteLL
Well-known member
Greetings.
I am about to start a build of a 24 X 30 metal building in Texas.
I am in the good situation of the previous owner leaving me 4 1/2 cubes of brick that matches the house. So that means...I've got to use it!
Besides having a brick ledger poured with the foundation, what other steps should I go about planning for brick? I know it has been done MANY times before, but I can't find a good cross section view or diagram of how everything should tie together.
What should be done in prep for a brick facing?
I am about to start a build of a 24 X 30 metal building in Texas.
I am in the good situation of the previous owner leaving me 4 1/2 cubes of brick that matches the house. So that means...I've got to use it!

Besides having a brick ledger poured with the foundation, what other steps should I go about planning for brick? I know it has been done MANY times before, but I can't find a good cross section view or diagram of how everything should tie together.
What should be done in prep for a brick facing?

