After a year and a half wait the barn floor got poured! The sealer went on today. Had to remove the man door due to being too low for the floor, I'll reinstall shortly. Within the next week and a half I'm having two aprons around the barn poured too. On on the front and one big one on the side for a overhang I'm adding. I update this thread with pics as I go!
The 1st day the contractor leveled the gravel that's been there, vapor barrier, and screen.
The 2nd day the floor got poured and smoothly finished.
Now with the sealer on it. Big improvement over gravel!