Thanks all for your replies.
From LarryG:
How long has the leach field been dry?
The septic tank will be pumped out and destroyed 30 days prior to construction. It will be in use until the day the tank is pumped out and destroyed.
what soil conditions do you have?
Red clay mostly, through I do believe that the person who dug the leach field dug out the clay directly where each line would go and put in sand or similar earth.
how deep is the piping?
I am sure that the person who dug the septic and lines did a cheap, crappy job. Probably, they are not as deep as they should be.
How long has the field been there?
At least 22 years.
Has the soil had time to compact over it?
I guess.
Do you plan to remove the piping?
Well, I didn't originally, but if it is wise and not too expensive, maybe I should.
What style of foundation are you using?
Rebar reinforced slab, with footers.
You say you are pumping out a leach field?
No, just pumping out the septic tank.
How was this 'field' constructed?
In the conventional manner for a trailer house in the woods, where permits are not required. I have no clue what manner that is, though.
I would add to all this that there are trees growing all over the leach field area, and that there was one place where for years some of the septic water would come up through the earth. It doesn't usually anymore, but perhaps the earth is just saturated. The trees will be cleared away 30 days after the septic tank is pumped out and destroyed, regardless of whether I build there or not. I figure 30 days, and they will drink up
some of the septic water, at least.
I appreciate all input.