I am having a garage builder, build my 50x30 (detached) stick garge the end of Sept. I want to have full wiring in this with some 220 usage as well.
My question is........Do I have the wiring guy come in and run all the wiring TO the building first...or after they have made the lay-out? Or does the wiring guy come in after the concrete has been poured and the frame and outer shell is done, before they insullate and finish the walls?
The reaason I ask is that I see the pictures of garages on the forum and I see that the wires come up from the ground and into the building. Just wondering how/when that is actually done.
Sorry. I am not much into building or wiring. I am a tinker'r of cars, bikes and lawnmowers.
My question is........Do I have the wiring guy come in and run all the wiring TO the building first...or after they have made the lay-out? Or does the wiring guy come in after the concrete has been poured and the frame and outer shell is done, before they insullate and finish the walls?
The reaason I ask is that I see the pictures of garages on the forum and I see that the wires come up from the ground and into the building. Just wondering how/when that is actually done.
Sorry. I am not much into building or wiring. I am a tinker'r of cars, bikes and lawnmowers.