600SL
Well-known member
I believe culvert is the right terminology?
In any case I'm not expecting the road going over my drainage pipe to hold up as is. I would like to build two concrete wall one on each side the dimensions would be ~25x4x1 with 1ft below the low ground and 3 ft above. Because this is a long span I would like to tie the two walls together using tie bars probably to an I beam embedded into the walls on each side. Since the tie bars will span across the dirt and be buried in the dirt what option are there for corrosion protection of these bars. One option I was thinking was sealing them into a PVC Pipe?
In any case I'm not expecting the road going over my drainage pipe to hold up as is. I would like to build two concrete wall one on each side the dimensions would be ~25x4x1 with 1ft below the low ground and 3 ft above. Because this is a long span I would like to tie the two walls together using tie bars probably to an I beam embedded into the walls on each side. Since the tie bars will span across the dirt and be buried in the dirt what option are there for corrosion protection of these bars. One option I was thinking was sealing them into a PVC Pipe?

