Hello,
I'm building a 24x30 garage in my back yard (metro DC area). Have the permits approved already. The estimates I've been receiving for the concrete foundation & floor have been very high ($9,000 - $21,000). I am considering doing the excavation myself, which I'm told from the contractors would reduce the cost by about $5,000-$10,000.
County code calls for 24" footing and a 4" floor, which is what I plan to do with a monolithic pour. Can someone help me figure out the correct sequence of steps, or maybe recommend a book? I can rent all of the equipment (bobcat, backhoe, etc) locally. More specifically, what I'd like to know is the order of steps, i.e., first remove the topsoil, then level the 24x30 lot, then place the gravel, then dig the footing, etc.
This is the foundation plan I'm going for:
Any help is appreciated.
I'm building a 24x30 garage in my back yard (metro DC area). Have the permits approved already. The estimates I've been receiving for the concrete foundation & floor have been very high ($9,000 - $21,000). I am considering doing the excavation myself, which I'm told from the contractors would reduce the cost by about $5,000-$10,000.
County code calls for 24" footing and a 4" floor, which is what I plan to do with a monolithic pour. Can someone help me figure out the correct sequence of steps, or maybe recommend a book? I can rent all of the equipment (bobcat, backhoe, etc) locally. More specifically, what I'd like to know is the order of steps, i.e., first remove the topsoil, then level the 24x30 lot, then place the gravel, then dig the footing, etc.
This is the foundation plan I'm going for:
Any help is appreciated.