Hi Guys
I'm new to the board. Was referred from a few places so I figured I'd join in.
Now, I'm sure this question has been covered MANY times, but I'm looking to build a garage on our lot up north this coming spring. The lot is in Florence, WI and has grainy sand soil as deep as you care to dig.
We are looking at building a 24x32 or so sized stick built garage. It would need to be cut in 2-3' over the length of the building (gable door at starting grade and digging the rest of the building in). Now I guess my question is how is this typically done? Do you build a 'jagged' block wall as it goes in?
Can anybody give a rough guestimate as to what the concrete/block work would run. Also what your typical materials would run? (METAL roof, Vinyl siding, very basic construction)
A picture of the building area (would be building straight into the hill back to towards the right with it starting at the edge of the gravel pad).
I'm new to the board. Was referred from a few places so I figured I'd join in.
Now, I'm sure this question has been covered MANY times, but I'm looking to build a garage on our lot up north this coming spring. The lot is in Florence, WI and has grainy sand soil as deep as you care to dig.
We are looking at building a 24x32 or so sized stick built garage. It would need to be cut in 2-3' over the length of the building (gable door at starting grade and digging the rest of the building in). Now I guess my question is how is this typically done? Do you build a 'jagged' block wall as it goes in?
Can anybody give a rough guestimate as to what the concrete/block work would run. Also what your typical materials would run? (METAL roof, Vinyl siding, very basic construction)
A picture of the building area (would be building straight into the hill back to towards the right with it starting at the edge of the gravel pad).