datsunfan
Well-known member
I am about to sign the contract for my new house to be built on a 1-acre lot that I already own. The builder says his standard electrical service is 200 amps but for $100 extra he will upgrade to 400 amps so I will have "plenty of power" for a shop I want to add later (30x40 pole barn).
Also the proposal says $750.00 for 100 amp sub-panel for future shop/garage. Is this a good idea? Would it cost alot more if I waited until I actually build the shop (after selling my existing house) to add this sub-panel?
AND I would like to have a transfer switch on the house so if the power goes out I can hook up a portable generator that I already own to run some essential items on the house only. The builder has not given me a price on this yet. If I decide to wait and add that feature later, does the cost get
alot higher, to the point where I can no longer afford it? What kind of pricing should I expect on something like this?
Thank You!
Also the proposal says $750.00 for 100 amp sub-panel for future shop/garage. Is this a good idea? Would it cost alot more if I waited until I actually build the shop (after selling my existing house) to add this sub-panel?
AND I would like to have a transfer switch on the house so if the power goes out I can hook up a portable generator that I already own to run some essential items on the house only. The builder has not given me a price on this yet. If I decide to wait and add that feature later, does the cost get
alot higher, to the point where I can no longer afford it? What kind of pricing should I expect on something like this?
Thank You!