Im starting to get bids on having my new 24 x 30 x 10 metal building garage built.
I have septic leach line that will run in the middle of new building roughly 8 feet in.
I had septic guy come out to bid to relocate or cap run new line.
My system is 45 years old. So lines and d box are 3 feet deep.
Septic guy said he would have to move dbox up to 2 foot depth because new code. This will line up new line. Not sure how he plans to tie other lines to new depth. Said roughly $2k.
With that said. He told me to let them build the building and if no issues happen with line not to worry about it. If issue arrives he would resolve it.
I dont like the idea of rolling the dice.
I called couple other guys and they won't even look at job with out the health department saying what we can do.
Id rather not involve them if i dont have too.
What would you all do in this situation?
I have septic leach line that will run in the middle of new building roughly 8 feet in.
I had septic guy come out to bid to relocate or cap run new line.
My system is 45 years old. So lines and d box are 3 feet deep.
Septic guy said he would have to move dbox up to 2 foot depth because new code. This will line up new line. Not sure how he plans to tie other lines to new depth. Said roughly $2k.
With that said. He told me to let them build the building and if no issues happen with line not to worry about it. If issue arrives he would resolve it.
I dont like the idea of rolling the dice.
I called couple other guys and they won't even look at job with out the health department saying what we can do.
Id rather not involve them if i dont have too.
What would you all do in this situation?