karoc
Well-known member
Good morning guys, I had ask similar question about pads for slab while back. The answers were fantastic which gave me information to ask contractors questions. But one of the contractors that I was talking to ask me how did I want to treat the edges of the pad. He had suggested taking some of the top soil that I had removed and use it to pack down on the outer edges of the 60/40 sand/clay mix. So I was wondering does this sound right to ya'll? He said if nothing is done that over time it may start to wash away. I do plan on having gutters installed and pipe to lower side of where the pad will be. Which there is a good slop to my property, I don't want the two corners on the high side of pad to wash out from rain. Asking for any thoughts on how to handle the edges of the pad and also on the two corners of the pad that is on high side.
Added this pic, looking in this direction is also the direction of the slop.

Added this pic, looking in this direction is also the direction of the slop.

Last edited: