05wrangler
Well-known member
I have been looking into starting my pole barn build soon. I have a guy that gave me a price to build up the grade as my land slopes pretty quickly in the back. I need to bring the front up 1 foot and the back up 3 feet ( total fall is absolutely 2 feet, but getting the front up to ensure no water comes in). So I am building a 24 wide, 30 foot deep structure. He says he will slope the stone (I'm not sure what type) 2 feet out, so basically I'll be looking at 28x34 foot print. He also says he won't need to compact it. What do you guys think about all this. Here is what I'm thinking please correct me if I'm wrong.
1- remove top soil underneath
2- compact in 4 inch lifts.
I'm also a little nervous about the 2 foot slope being ok. I'm wondering if it would be easier to just dig footing and lay block and stick build. I'm open to any ideas here guys as I would really like to get it built. Also, the floor will be 6-8 inch think.
Thanks for your time and help!
Sent from my SAMSUNG-SM-G870A using The Garage Journal mobile app
1- remove top soil underneath
2- compact in 4 inch lifts.
I'm also a little nervous about the 2 foot slope being ok. I'm wondering if it would be easier to just dig footing and lay block and stick build. I'm open to any ideas here guys as I would really like to get it built. Also, the floor will be 6-8 inch think.
Thanks for your time and help!
Sent from my SAMSUNG-SM-G870A using The Garage Journal mobile app

