rust buster
Well-known member
I purchased a 7.5 HP North American Rotary Phase converter to run my Doall 16-3 bandsaw (220V 13.5A 3ph) and Scotchman cold saw (230V 12A 3ph). These would nver be operated at the same time. Both pieces of machinery are 35’ away from my 100A panel and within sight.
My plan is to run #8 wire from the single phase panel to the RPC control on a 40A breaker. Then, out of the RPC control to a 125A 12 space QO 3ph load center via #10 wire. Certainly don’t need 125A, but I had to find one with at least 6 spaces. There will be two 20A 3-pole breakers (one for the band saw and one for the cold saw). #12 wire from the panel to each machine. Both machines have disconnects on them and will plugged into receptacles off the new panel.
Does this pass muster? I’m following the wire sizing guide in the RPC manual, but it’s a strange formula. Am I on the right path?
Thank you in advance.
My plan is to run #8 wire from the single phase panel to the RPC control on a 40A breaker. Then, out of the RPC control to a 125A 12 space QO 3ph load center via #10 wire. Certainly don’t need 125A, but I had to find one with at least 6 spaces. There will be two 20A 3-pole breakers (one for the band saw and one for the cold saw). #12 wire from the panel to each machine. Both machines have disconnects on them and will plugged into receptacles off the new panel.
Does this pass muster? I’m following the wire sizing guide in the RPC manual, but it’s a strange formula. Am I on the right path?
Thank you in advance.