This is what i got or i should say,what i can do.Im on a very very tight budget,i can get a 30x40x12 steel tube building turn key 14,5000 not including power or full insulation,i dont know anyone with one so i really cant compare to anything. i need to put up something soon and only have a small budget,polebarn outy of my budget and a stick built is way out,is there anybody using one for a light duty shop,i do plan on putting a lift in it too,i know they sweat alot to if not insulated well,are these worth the money?
