Hello all,
Getting ready to pour slab for my 1200' garage build. Most of the structure is complete, just pouring floating slab near the end of the build. Anyway, I have placed a couple of runs of 2" pvc to come up in the middle of the floor to be able to run future air, hydraulic or whatever to a lift. How can I cap off flush with the slab until I am ready to use?
Getting ready to pour slab for my 1200' garage build. Most of the structure is complete, just pouring floating slab near the end of the build. Anyway, I have placed a couple of runs of 2" pvc to come up in the middle of the floor to be able to run future air, hydraulic or whatever to a lift. How can I cap off flush with the slab until I am ready to use?