Ramper
Well-known member
Here is my "plan" from bottom to top:
My terminology might not be right. I have a 30x40 metal shop with six "rafters". There are two "joists" perpendicular to these "rafters". I added more to support the foam.
So it is metal and prodex (double bubble) below the 2x4's and 8" of EPS above them.
I would like to maybe blow-in some additional insulation (I put it the covers at the vents (only one side had them)).
How does this sound for a MN Winter?
- Metal roofing screwed to joists
- Prodex stapled to joist
- Air space (width of 2x4 joists)
- Two layers of 4" eps foam fitted on top of joists
- Cannned Spray foam in all cracks
My terminology might not be right. I have a 30x40 metal shop with six "rafters". There are two "joists" perpendicular to these "rafters". I added more to support the foam.
So it is metal and prodex (double bubble) below the 2x4's and 8" of EPS above them.
I would like to maybe blow-in some additional insulation (I put it the covers at the vents (only one side had them)).
How does this sound for a MN Winter?