My shop will be completed in a few phases. I have some questions about Phase 2, insulation.
Phase 1 will be completed by my builder and will leave me with a 30 X 40 X12 Block building with one insulated walk out door, one insulated garage door, no windows, and an open ceiling (exposed trusses) to an uninsulated roof. Roof will have ridge vent and soffit vents.
Phase 2 will be to insulate the roof and / or ceiling. I am in East Tennessee, so pretty mild climate. If I finish the ceiling, on the bottom side of the bottom chord of the trusses, and insulate on top of that finished ceiling, would that be proper? Seems it would prevent heat loss through the ceiling while keeping the space around the trusses (attic) as unconditioned space that will vent through soffit and ridge vent.
Heating and possibly cooling will come later along with potentially framing, insulating, and finishing interior walls if necessary. I think for my mild climate stopping heat loss through the ceiling may be sufficient.
Phase 1 will be completed by my builder and will leave me with a 30 X 40 X12 Block building with one insulated walk out door, one insulated garage door, no windows, and an open ceiling (exposed trusses) to an uninsulated roof. Roof will have ridge vent and soffit vents.
Phase 2 will be to insulate the roof and / or ceiling. I am in East Tennessee, so pretty mild climate. If I finish the ceiling, on the bottom side of the bottom chord of the trusses, and insulate on top of that finished ceiling, would that be proper? Seems it would prevent heat loss through the ceiling while keeping the space around the trusses (attic) as unconditioned space that will vent through soffit and ridge vent.
Heating and possibly cooling will come later along with potentially framing, insulating, and finishing interior walls if necessary. I think for my mild climate stopping heat loss through the ceiling may be sufficient.