Assuming you have to span the full 30 feet, and not between the trusses as was suggested, talk to a lumberyard about sizing an LVL (Laminated Veneer Lumber) beam. It's basicly huge engineered plywood. You cut it with standard saws, drill it, nail it, bolt it. It's lighter than steel. Still not cheap. The lumberyard can send out the requirements and the factory engineering department will size the beams at no charge, and give you a full design including crossmembers carried by the beam.