2level
Well-known member
While cleaning out the chimney (masonry) the other day, I noticed the smoke shelf only goes about 1/4th of the way back. Then it's open air. There is a big void between the back of the firebox and the chimney outer wall.
Did the mason screw up the design or do a incomplete job? I'm thinking about filling the void with sand ( probably 2-300lbs.) and topping with a layer of mason mix.
Has anyone seen a smoke chamber built like that?
Did the mason screw up the design or do a incomplete job? I'm thinking about filling the void with sand ( probably 2-300lbs.) and topping with a layer of mason mix.
Has anyone seen a smoke chamber built like that?