John Dillinger
Active member
The process of building the shop has been a slow one . After the floor was poured the pallets of block set on the floor for about a month before the walls were started. The masons finished the week before Christmas and then the winter set in until the middle of April. I did not have time ot the weather conditions to do a good clean up until the end of April first of May. The floor was power washed and looked grate until it dried. Where the pellets of block were stored and where mud was tracked across the floor there is stains that the pressure washing will not remove.
When the floor was finished I told them to put a mirror finish on it and they did a exelent job now I have these mud stains that WILL NOT come up it is almost like they are down in the concrete I even tried the real TSP did not even touch them. I do not know what to do.
JD
When the floor was finished I told them to put a mirror finish on it and they did a exelent job now I have these mud stains that WILL NOT come up it is almost like they are down in the concrete I even tried the real TSP did not even touch them. I do not know what to do.
JD
