Well-known member
For those with spray foamed pole buildings, would you mind sharing a pic of the inside of your roof?
Local company is doing 3" of closed cell under the roof of mine and says it will not be an issue to just fill the area between the perlins.
This will make it easier to install steel interior panels directly to the perlins but will this be a problem if they are not entirely enclosed or insignificant?
Perlins are 2x4 on 24" centers.
Local company is doing 3" of closed cell under the roof of mine and says it will not be an issue to just fill the area between the perlins.
This will make it easier to install steel interior panels directly to the perlins but will this be a problem if they are not entirely enclosed or insignificant?
Perlins are 2x4 on 24" centers.