In escrow on bare land property. Had an engineer layout a system on property and had a septic company dig the test pits yesterday.
The engineer told me the soil will pass the State inspection no problem and that it would be fine to go ahead and close on the deal. They don't do drainage tests here, just look at soil down to 4' and verify the engineers plans.
It could take 3 weeks to get the actual approval from the state. Should I push back the closing date waiting for the actual permit, or is it fine to go by the Engineers Soil Morphology report as the engineer says?
I did talk to several septic companies, and it is extremely rare for a property in the area to fail state inspection. Like they couldn't even think of one.
The engineer told me the soil will pass the State inspection no problem and that it would be fine to go ahead and close on the deal. They don't do drainage tests here, just look at soil down to 4' and verify the engineers plans.
It could take 3 weeks to get the actual approval from the state. Should I push back the closing date waiting for the actual permit, or is it fine to go by the Engineers Soil Morphology report as the engineer says?
I did talk to several septic companies, and it is extremely rare for a property in the area to fail state inspection. Like they couldn't even think of one.