central1ny
Well-known member
- Joined
- Feb 22, 2009
- Messages
- 134
I will be relocating my meter which will place the meter approx. 8 feet farther away from the service panel than it is currently at. What I would like to do is run the service entrance cable from the meter into the basement to a disconnect. This cable would be the same length as the existing cable. I would then run a new cable from the disconnect to my existing service panel. Are there any issues here? Does anyone know of a specific NEC code that would prohibit this? Thanks.