I haven’t really posted much here, but here it goes!
I’ve started a 32x36 garage build, standard construction with attic trusses.
I’ve had the foundation and walls poured by a local company, but they said they don’t do the backfill, that is up to the flatwork company. Well ok, but my problem is that my friends and I are the flatwork company!! We’ve got a group that help each other out with pours, mainly driveways and garage floors. I have never done any of the prep work myself, just helped out.
I managed to get a concrete contractor that I know to do me a favor and do the backfill. I asked them to compact it, but I was not there when it was done, and I don’t think they compacted it at all, but i am not even sure how to tell. Most all of the fill is sand (I live on a lake that was a former sand pit in the 60’s, so most everything is sand with about 12”-18” of topsoil on it so that grass will grow)
The backfill was done in early January (it never really froze hard in Nebraska this year) so it has had some snow and rain on it which should have helped settle the ground, but it doesn’t look like it has settled much, if at all.
so my main questions:
1. How do I tell if it’s compacted or not?
2. If it’s not, how do I compact it now that there is 4 feet of fill already placed? (I have heard of somebody basically doing a water injection with a 1/2 copper pipe and a garden hose?)
3. Since it’s mostly sand, do I even have to worry about it?
Other info: stem wall will about 6” above finished floor, I plan to do in floor heat, so I plan on 2” foam board and a 5” thick floor.
Thanks all!!
Mitch
I haven’t really posted much here, but here it goes!
I’ve started a 32x36 garage build, standard construction with attic trusses.
I’ve had the foundation and walls poured by a local company, but they said they don’t do the backfill, that is up to the flatwork company. Well ok, but my problem is that my friends and I are the flatwork company!! We’ve got a group that help each other out with pours, mainly driveways and garage floors. I have never done any of the prep work myself, just helped out.
I managed to get a concrete contractor that I know to do me a favor and do the backfill. I asked them to compact it, but I was not there when it was done, and I don’t think they compacted it at all, but i am not even sure how to tell. Most all of the fill is sand (I live on a lake that was a former sand pit in the 60’s, so most everything is sand with about 12”-18” of topsoil on it so that grass will grow)
The backfill was done in early January (it never really froze hard in Nebraska this year) so it has had some snow and rain on it which should have helped settle the ground, but it doesn’t look like it has settled much, if at all.
so my main questions:
1. How do I tell if it’s compacted or not?
2. If it’s not, how do I compact it now that there is 4 feet of fill already placed? (I have heard of somebody basically doing a water injection with a 1/2 copper pipe and a garden hose?)
3. Since it’s mostly sand, do I even have to worry about it?
Other info: stem wall will about 6” above finished floor, I plan to do in floor heat, so I plan on 2” foam board and a 5” thick floor.
Thanks all!!
Mitch