Hey guys finally starting my build of a 60x36x12. I will be putting in the 6x6s this next week. I have a 2' drop from one end to the next and have been bringing in fill this past week. Ill be putting down 6"-8" at a time and then using a plate compactor on it before putting another 6"-8" down. My question is if Im putting my posts 4' in the ground, do I need to go actually 6' in the 2' filled area so Im going 4' into undisturbed soil, or will the compaction make it good enough so I would be roughly 2' into undisturbed and 2' into fill. I will be pouring a 4" mono slab with about 1' outer edges set on top of the concrete for the post. Any thoughts would be appreciated.