A company is going to vaccum and scrape full broadcast chips before laying down the polyaspartic top coat today. It looked great but The issue is upon inspection there are many areas where it looks like there is almost no epoxy as if too little was used there or the concrete absorbed it. Will this be an issue and what should I do? The first photo you can see it on the left. If I take my fingernail to it lightly it feels like cement. Thanks 

