Hello, I've got a question about concrete blisters. I had the slab poured in my new shop last friday 24' X 44'. 6" thick throughout with 8" pour where my lift will go. I noticed some blisters on Sunday, maybe 20 - 30 of them, 1 in the smallest a few maybe 2 1/2" or so across. Haven't noticed any new ones but haven't kept a real close eye on them. I'm not a concrete guy but have seen them before on new construction occasionally. Causes I've been told are working the surface too soon or over working it sealing the moisture in? But the big question is how should I hold the contractor accountable? Should there me a monatary adjustment, or should I insist they repair the surface after it's cured? I've done quite a few epoxy jobs on concrete, some with blisters that I've repaired over the years. So I have the ability, but I paid for a quality job and expect that. Thoughts / advice on how to deal with the contractor? Thanks in advance!