scottzilla
Well-known member
- Joined
- Mar 27, 2009
- Messages
- 200
I've been getting quotes for a 24x24 slab built to local code (Footers, 4' frost wall, 4-6' slab) between $7200-$7800, excavation included with back fill.
One company told me $125 per yard and this is a 28 yard job.
So in reality, I seem to be paying as much for excavation as the concrete itself.
One company told me $125 per yard and this is a 28 yard job.
So in reality, I seem to be paying as much for excavation as the concrete itself.



