My garage floor will be poured by the end of the week and I am wondering -

How long should a fresh poured concrete slab cure before a floor is installed?
I haven't decided yet if I am going with VC tiles or epoxy but want to make sure the concrete has set up the proper amount of time.

Thank you in advance
Greg
 
To avoid these ads, REGISTER NOW!

Junkman

Well-known member
Joined
Dec 18, 2006
Messages
6,639
Location
Northeastern CT
It takes 30 days for concrete to set up to about 80% of its strength. Since you haven't had it poured yet, I will suggest that you consider putting wire in the floor, plastic under the floor, and keep it moist for as long as you can after the initial 24 hours. The wire will keep the floor from separating if it cracks, the plastic will retard quick curing and keep moisture from coming up from underneath, and the water on the floor will help it to cure more slowly giving it more strength ultimately. I also have fiber added to mine when it was done. They claim that it adds strength, and it was only a few dollars more per yard. I went with a 5000 # mix 6" thick in my garage. That was before concrete prices went out of sight.
 

boiler7904

Well-known member
Joined
Apr 4, 2006
Messages
3,414
Location
NW IN
Every flooring (VCT, epoxy, carpet, ceramic, etc.) manufacturer is going to say to wait at least 28 days after concrete is placed or when the floor passes a moisture test - whichever comes later. They all say to wait as long as possible and prefer around 60 days but 28 will usually be allowed.

There are a few ways to test for moisture. First (and most expensive option) is to buy an electronic moisture meter. This is overkill and unneccessary for the average DIY unless you have loads of extra money and want to buy a cool little tool.

Second option is to take plastic sheeting (a cut up garbage bag works too) and tape 2' x 2' squares to the slab with duct tape for at least 24 hours. At the end of 24 hours, remove the tape and plastic. If the square that was covered is damp or darker in color, you have moisture being transmitted through the slab. I would do this in at least two or three places throughout the slab to make sure it is curing evenly.

There are several things that can be done to help the concrete cure sooner/better without damaging the finished product.

1. If the building isn't up yet, tarp the entire site prior to the pour if rain or snow is in the forecast. Any water that gets into the subgrade has to get out somehow (most likely through your slab).

2. Install a vapor barrier. It keeps ground moisture at bay for the most part assuming its installed properly and not torn during the pour.

3. Cover the slab with burlap and keep it damp during the first few days of the cure. It seems counter productive but concrete cures by hydration, a chemical process that needs water to completely hydrate the lime in the cement. It also keeps the surface from curing a lot faster than the lower portions of the slab. Curing too quickly and unevenly leads to cracking.

4. If you have the building up, run an HVAC system.
 
To avoid these ads, REGISTER NOW!

6t7gto

Well-known member
Joined
Dec 6, 2005
Messages
522
Location
bedford,ohio
Greg,
make sure your cement contractor does not seal the floor.
otherwise, you will have to remove it for any type of epoxy finish
david
 
OP
G

gcan

Well-known member
Joined
Dec 30, 2006
Messages
152
Location
Alabama
6t7gto said:
Greg,
make sure your cement contractor does not seal the floor.
otherwise, you will have to remove it for any type of epoxy finish
david


will do thanks!
 