I poured concrete for a lamp post base two days ago, and stripped off the forms tonight. It hasn't cured completely yet, but I don't know how long it should take?
Tonight, it was strong enough to be okay without the forms, but I can easily scrape the top layer off with a piece of plywood. And very light taps with a hammer will compress the ridges (from the form edges) pretty easily.
Our daytime temps have been 69 and 67 for the past two days, with overnight temps around 10-15 degrees cooler (pretty nice for December). I mixed the concrete slightly dry so I could get it to pack down hard in the forms (2 qts of water instead of 2.5 qts per 60 lb bag). I've sprayed it with water mist twice each day and kept it pretty well covered with plastic. But the surface is still soaking up water like a sponge tonight.
Here are some photos showing the prep work for the form:
For the bottom half, I poured in half a bag at a time and mixed water in the hole:
I couldn't find any wax so I coated the form with a little used motor oil:
For the top half, I poured it wet and packed it in tight, but I ran out of daylight and couldn't get a photo of the wet concrete.
Here's the cover I used for the night:
I'll post some photos of the stripped forms in the morning. Should I just keep misting it with water or do I need to wrap it in plastic?
Thanks,
Tonight, it was strong enough to be okay without the forms, but I can easily scrape the top layer off with a piece of plywood. And very light taps with a hammer will compress the ridges (from the form edges) pretty easily.
Our daytime temps have been 69 and 67 for the past two days, with overnight temps around 10-15 degrees cooler (pretty nice for December). I mixed the concrete slightly dry so I could get it to pack down hard in the forms (2 qts of water instead of 2.5 qts per 60 lb bag). I've sprayed it with water mist twice each day and kept it pretty well covered with plastic. But the surface is still soaking up water like a sponge tonight.
Here are some photos showing the prep work for the form:
For the bottom half, I poured in half a bag at a time and mixed water in the hole:
I couldn't find any wax so I coated the form with a little used motor oil:
For the top half, I poured it wet and packed it in tight, but I ran out of daylight and couldn't get a photo of the wet concrete.
Here's the cover I used for the night:
I'll post some photos of the stripped forms in the morning. Should I just keep misting it with water or do I need to wrap it in plastic?
Thanks,