When pouring a footer into a trench that has been saw cut into an existing slab and will be doweled to the existing, using 4500psi mix with a curing accelerator, 80 degree temps,
What kind of time would be needed for the concrete to cure enough to be able to be drilled for anchor bolts and weight applied?
What kind of time would be needed for the concrete to cure enough to be able to be drilled for anchor bolts and weight applied?