dantheman8119
Active member
- Joined
- Feb 14, 2009
- Messages
- 40
Hey everyone -
I'm planning to build a pole barn in the next 2-3 years in the following location...
My question is that I am pondering putting in a concrete driveway as well, possibly before hand. I'm wondering if anyone would see an issue with the heavier equipment needed to build a pole barn, as well as bringing in gravel/fill needed and a future concrete pad in the pole barn over an existing concrete driveway? I would hate to damage it in the process of putting up the pole barn!
I'm planning to build a pole barn in the next 2-3 years in the following location...
My question is that I am pondering putting in a concrete driveway as well, possibly before hand. I'm wondering if anyone would see an issue with the heavier equipment needed to build a pole barn, as well as bringing in gravel/fill needed and a future concrete pad in the pole barn over an existing concrete driveway? I would hate to damage it in the process of putting up the pole barn!
