dusterdoug
Well-known member
I just poured my new driveway and i am trying to pin point an amount of time I need to let it dry before I drive on it, or park my race car enclosed trailer (10000 lbs) on it.
The concrete is 4"+ thick, 2500 pound mix with 3/4 rock and #4 rebar 2' on center.
Any opinions.
I have been told 2 weeks for a car to drive on it. but don't park the trailer on it for 2-3 months?

The concrete is 4"+ thick, 2500 pound mix with 3/4 rock and #4 rebar 2' on center.
Any opinions.

