Have decided that I am going to put a wood floor in the oldest part of my studio. This building was originally a 24' wide x 36' deep garage - built about 40 years ago. It has a sloped concrete floor not particularly flat .. lots of minor cracking.
I was originally going to have the concrete floor removed .. a proper base constructed and do a radiant slab with PEX ... but I really want wood ... and a high mass floor is not ideal for this application .. the quote a few years ago for the slab/pex was around 15k.
Currently the concrete floor is about 1" bellow the top of the foundation block at the high end and about 4 inches bellow at the other end .. so it drops about 3" in 36 feet. I was thinking of having a vapor barrier put down over the old concrete and then pouring a new level concrete floor .. ideally to the top of the foundation ... but Im not sure that is think enough?
I would then install another another vapor barrier over the new concrete and 2x4 lumber on the flats, nailed to the slab through the upper vapor barrier with 1.5 inch foam panels between --- as rafters ... I would then place plywood or warm board (depending on $$ available) fastened to the 2x for a subfloor and then a 3/4 wood floor to finish it out.
I'm just not sure how thin the over-pour can be. Is a special product available?
I don't get any water in the building .. and it seems like a waste to go to great expense of ripping it all out and then just cover the new slab?
Any thoughts? I have not priced a new slab without the pex.
I was originally going to have the concrete floor removed .. a proper base constructed and do a radiant slab with PEX ... but I really want wood ... and a high mass floor is not ideal for this application .. the quote a few years ago for the slab/pex was around 15k.
Currently the concrete floor is about 1" bellow the top of the foundation block at the high end and about 4 inches bellow at the other end .. so it drops about 3" in 36 feet. I was thinking of having a vapor barrier put down over the old concrete and then pouring a new level concrete floor .. ideally to the top of the foundation ... but Im not sure that is think enough?
I would then install another another vapor barrier over the new concrete and 2x4 lumber on the flats, nailed to the slab through the upper vapor barrier with 1.5 inch foam panels between --- as rafters ... I would then place plywood or warm board (depending on $$ available) fastened to the 2x for a subfloor and then a 3/4 wood floor to finish it out.
I'm just not sure how thin the over-pour can be. Is a special product available?
I don't get any water in the building .. and it seems like a waste to go to great expense of ripping it all out and then just cover the new slab?
Any thoughts? I have not priced a new slab without the pex.