5wndwcpe
Well-known member
I know you guy's usually hate these kind of questions, but because of some, let's say creative differences between the GC and myself, it looks like I'll be doing all of the prep work for the slab myself, ie. the vapor barrier, insulation, wire, yada yada yada. The concrete itself I can figure seperately. What I'm looking for is a ball park on the labor to pour and finish it. It's 1600 sq. ft., 6" thick #4000, power trowled and will be pumped in so there won't be too much wheeling to do, if any. Guesstimate ?