I have a slab that's appx 24x36 being poured. I am choosing to get a pro to do the pour/finish work. I am gonna pay for the material.

What's reasonable rate for the labor? The site is ready to go except for placing some rebar/mesh, expansion joints, etc.

Thanks!
 
To avoid these ads, REGISTER NOW!

His200HerScout

Well-known member
Joined
Mar 17, 2009
Messages
217
Location
mid-michigan
I have a slab that's appx 24x36 being poured. I am choosing to get a pro to do the pour/finish work. I am gonna pay for the material.

What's reasonable rate for the labor? The site is ready to go except for placing some rebar/mesh, expansion joints, etc.

Thanks!

Not sure where you are located, but I just paid $3.25 sqft for a 32x52, 4" floor with wire mesh, and they scored it with a concrete saw after it was poured. That is labor and materials. And their work was far superior to any other concrete work I've ever had done.
 

Bigrhamr

Well-known member
Joined
Apr 16, 2009
Messages
293
Location
North Idaho
for a 60x80 slab I got labor only quotes ranging from .55 to 1.00 per square foot. That's with it ready to go, they just pour and finish. The 1.00 rate also included sawcuts and sealing. Get on the services section of craigslist, find a few concrete guys and ask for quotes then see if you can come watch them do a floor. If they say no go on to the next guy.
 
To avoid these ads, REGISTER NOW!

Jeffksf

Well-known member
Joined
Jul 24, 2007
Messages
381
Location
Cleveland Ohio
I paid my finishers $250 cash each, they were there all morning. I saw cut it, had it formed and ready to go.
 

nate379

Banned
Joined
Feb 2, 2009
Messages
7,279
Location
Palmer, AK
Yeah that's the kind of help I usually get too. Get some beer and sandwiches and that'll help sweaten the deal too.
 
OP
L
Joined
Apr 20, 2009
Messages
5
Thanks for all the info. My local concrete guy (who is known and recommended by everyone) charges $1.25/sqft.

I pay the materials, he brings the crew, the machines, does the pour, the finish, the stress-cuts, etc.

Sounds like a little to the high side of average, but in the ball park!?
 