blinn
Well-known member
I have a small room in my walkout basement level that has a dirt floor. It would make a great storage room but the dirt floor isn't so great! I would like to pour a concrete floor in there. A friend of mine has a small concrete mixer that will just fit inside the door. I'm thinking that I could but a divider board half way along the long edge. I could put the mixer on one half of the room and pour the other 1/2 of the room. When the first side is set, put the mixer on that side and pour the second half.
Does anyone see any problems with that technique? Also, how do I need to prepare the floor before pouring? I have about 5-6 inches of depth to work with. The room is 12.5' x 4.5' and the ceiling is about 12' high.
Thanks,
Brian
Does anyone see any problems with that technique? Also, how do I need to prepare the floor before pouring? I have about 5-6 inches of depth to work with. The room is 12.5' x 4.5' and the ceiling is about 12' high.
Thanks,
Brian