I am talking with several concrete people for my 36 x 48 heated and insulated pole barn project and i have heard everything and I am confused. One says wire is a unnecessary expense and will pour all at one time with a rat wall. another wants to pour in sections and use cold joints with rebar connecting the slabs with 2" foam then visqueen then foil bubble wrap. with a rat wall and foam on the inside floor around the perimeter in the rat wall. another will make one pour 5" with wire and fiber no rat wall or foam and only visqueen. what is the best way to pour this slab? I want 5" with fiber, 6 bag mix, and at least visqueen, foam is a plus. What about a rat wall and the foam or foil wrap? is wire necessary? is it better to use cold joints or should the pour be all at one time? HELP!!! I am running out of time. Thanks