I’ve read the guide to concrete floors and have poured a driveway many years ago. I have 2500 square foot horse barn that has been used as a shed for decades. Dirt floor mostly; so lots of dust kicks up. I would lime to turn it into a garage for working on my motorcycles and other projects. Unlikely a car will be in there without making new doors and putting down a 200 foot long driveway of sorts.
With costs these days I want to try and limit $$.
Since it’s a covered barn do I need gravel base layer?
I am planning on a 4 inch pour with 12inch footers.
Should I remove enough base layer so top of slab sits at current floor height? 2x4 wall studs sit fully above floor
Rebar?
With costs these days I want to try and limit $$.
Since it’s a covered barn do I need gravel base layer?
I am planning on a 4 inch pour with 12inch footers.
Should I remove enough base layer so top of slab sits at current floor height? 2x4 wall studs sit fully above floor
Rebar?