Just got my 24x24 barn up and im in stuck on what to do about my floor, i built on a hard slope(had no other options) so on one side of the barn im ground level and the other side im 2' from the ground, measuring the bottom of the skirt board. i knew what i was getting into doing this and i was just gonna fill back in with dirt i took out. a buddy of mine said not to do it that it would never settle right, he told me to take 304 and level it to the high side, so now the 20 ton i was expecting to put in turned into 40 ton, what would you guys do?