Jack of all trades
Active member
- Joined
- Mar 22, 2024
- Messages
- 31
Contractor ordered 10 yards truck came couldn’t get to garage site through yard and broke driveway so I stopped truck then contractor said he’d scatter it out with ga buggy and pour rest when yard is dry. I think it will create a weak floor and will crack out later on not sure I’m not a concrete guy but common sense tells me that he created a cold joint and that putting the rest on top will be like to pads on top of each other one being a few inches and other the same what says the experts in here thanks for opinions see pics. Was only pouring up to first mortar joint do bottom block not joint