I am in process of having a 30' X 40' pole barn style garage built. They are doing the floor later this week. The contractor said the guys he uses to do floor don't cut or score it. (sorry, I'm not sure if that proper terms). He stated they just pour one big slab. He said his personal garage same way.
I always heard they should be cut to help prevent cracking.
Do I need to insist it be cut/scored or does it matter?