hey everyone, i am getting ready to pour footers monday, they dont need to be formed, but i am trying to plan for the next steps.
i was able to get a pretty good amount of 1/2" plywood from work. i was wondering: would that be usable for column forms? these columns will be in between cbs block, so i will have a solid surface to anchor to. my carpenter says that half inch is too weak and will blow out under the weight of the concrete... i personally think it will be ok with a bit of extra 2x4 bracing.
anyone have any experience or opinions in this arena? i am trying to save money on wasting plywood on form work... has anyone used OSB for form work?? i can also get a. good amount of that too.
i was able to get a pretty good amount of 1/2" plywood from work. i was wondering: would that be usable for column forms? these columns will be in between cbs block, so i will have a solid surface to anchor to. my carpenter says that half inch is too weak and will blow out under the weight of the concrete... i personally think it will be ok with a bit of extra 2x4 bracing.
anyone have any experience or opinions in this arena? i am trying to save money on wasting plywood on form work... has anyone used OSB for form work?? i can also get a. good amount of that too.