Hey Gang,
Thanks to this site I'm going to epoxy my shop floor. I'm excited about it but my shop upgrade expenses have mysteriously grown uncontrollably since joining this site...
I have to rent a floor grinder, like most I assume, and around here they are ~$150 plus any fees. Because of that I would like to grind my entire floor in one go. The catch is that I can't epoxy my entire floor in one go.
I have to do the floor one half at a time due to space. Fortunately nothing is setup so I've got everything piled on one side. My concern is can I grind both sides, then epoxy the floor and let that cure for a week or so then move everything over to the expoxied side and repeat. I'm assuming I'll be fine but thought it best to double check. I really don't want to rent this thing twice.
-Clint
Thanks to this site I'm going to epoxy my shop floor. I'm excited about it but my shop upgrade expenses have mysteriously grown uncontrollably since joining this site...
I have to rent a floor grinder, like most I assume, and around here they are ~$150 plus any fees. Because of that I would like to grind my entire floor in one go. The catch is that I can't epoxy my entire floor in one go.
I have to do the floor one half at a time due to space. Fortunately nothing is setup so I've got everything piled on one side. My concern is can I grind both sides, then epoxy the floor and let that cure for a week or so then move everything over to the expoxied side and repeat. I'm assuming I'll be fine but thought it best to double check. I really don't want to rent this thing twice.
-Clint