Hi all,
New to this forum and urgently require advise. My house is higher than my neighbours and we have a shared driveway which leads to the garage. Water was going into the garage when it rained due to old uneven concrete. So I decided to get the whole shared driveway redone with my neighbour sharing the cost. The issue is that they have placed concrete 2 inches higher than the garage door bottom and left a gap so the door can swing open. Is this the right way, as it looks odd to me. Now the space they have left for the door to open will have a slight slop to allow the water to pass into the garden instead of going into the garage. The new concrete is slopping away from the garge into the centre of the shared drive and into a drain in the middle, which is fine. I cannot afford to raise the whole garage and ideas? Your help would be much appreciated. Thanks again.
New to this forum and urgently require advise. My house is higher than my neighbours and we have a shared driveway which leads to the garage. Water was going into the garage when it rained due to old uneven concrete. So I decided to get the whole shared driveway redone with my neighbour sharing the cost. The issue is that they have placed concrete 2 inches higher than the garage door bottom and left a gap so the door can swing open. Is this the right way, as it looks odd to me. Now the space they have left for the door to open will have a slight slop to allow the water to pass into the garden instead of going into the garage. The new concrete is slopping away from the garge into the centre of the shared drive and into a drain in the middle, which is fine. I cannot afford to raise the whole garage and ideas? Your help would be much appreciated. Thanks again.