Concrete is pitted - is patching needed?

Zmw

Well-known member
Joined
May 20, 2013
Messages
57
I am in my prep phase of my epoxy flooring in my garage. I am noticing the concrete is far more pitted than I realized. Nothing major, but small pits and divots all over the place.

Should I get the rustoleum concrete patch and smooth the surface out? Is this required, or only for a cleaner and smoother finished product?
 
To avoid these ads, REGISTER NOW!
OP
Z

Zmw

Well-known member
Joined
May 20, 2013
Messages
57
IMAG0346_zpse463cb63.jpg.html


http://s1367.photobucket.com/user/zwain1/media/IMAG0345_zps7a1389f8.jpg.html?sort=3&o=1

Hopefully these work, not really sure how to post pics...
 
To avoid these ads, REGISTER NOW!

The Bramptonian

Well-known member
Joined
May 23, 2013
Messages
64
Hi Scotty,

I had a same question as OP. I know most people recommend 2 part epoxy material for patching pitted concrete. However, I am curious if one could use the regular cement based concrete patching material instead as a cheaper solution? Or may be could I use anchoring cement to fill those holes/ cracks etc.? The reason I was leaning towards anchoring cement is because they expand as they cure and therefore theoretically should firmly lock in the place.

Any comments?

Thanks!



These will telegraph through.
Need to pre-fill. Our gel filler is one option, bondo is a cheap alternative in pinch.
 
Joined
Apr 14, 2013
Messages
6
Location
Houston Tx
Zmw- Good question. The answer is that it's optional. You will have a much smoother cleaner looking surface if you fill in the pits with an epoxy patch first, but if you don't, it's not going to cause a peel. The pits are caused by the rocks getting knocked out of the cement. It's a relatively easy and cheap fix, and will make a huge difference in the end result of your floor. Rustoleum makes a good patch as you noted. If you can't find it, then go with Sherwin Williams GP3500. It's a 2 part patch that comes in one Quart for Part A and one quart for Part B. Mix up just a little bit at a time, because it dries in minutes. After patching you can roll over it relatively quickly, usually in under an hour.

We have installed hundreds of garage floors, and every customer who has ever declined the patch work, has always regretted it after the epoxy has been applied because the pits stick out even more after the floor has been coated. After you apply the epoxy, it's a little too late to do patch work, unless of course you're willing to put down the money for another coat.

Therefore, I highly recommend filling in the pits.... otherwise, you will regret it.

Best Luck!
 