There's a sunken area in my workshop (~1/2" deep, 2' diameter) approximately where my welding table will be. I was going to fill it with leveling cement, but I've been told that I should skim coat the entire floor if I do this. Is this true? Is there a better solution (aside from leaving it low, like I'm thinking now).