Kcourter74
Member
- Joined
- Jul 24, 2010
- Messages
- 10
I've read this board religiously for about year as I considered epoxying my garage floor. I decided to take the plunge a few weeks ago and have spent the time prepping the floor (cleaning, power washing, degreasing, more degreasing, acid etching, more power washing, etc).
I was finally done with the prep last Sunday and was going to give my floor the whole week to dry. The forecast was for a beautiful weekend here in Ohio and sure enough as I type this it's low to mid 60s (same for tomorrow). My timing was working out perfect until the floor seems to not have dried completely. Throughout the week, it was cold (mid 40s) and very rainy. Only yesterday did it stop raining and today and tomorrow are beautiful (as I mentioned above).
Do I just need to wait longer? Or is something else going on here?
Thanks!
Here's the dirty floor before prep:
Here's when finished and notice the areas that are darker, seemingly not yet dry:
Another view:
Close up:
I had a dehumidifier running during the week and when i changed the placement, it even showed a footprint of the dehumidifier. Weird.
I was finally done with the prep last Sunday and was going to give my floor the whole week to dry. The forecast was for a beautiful weekend here in Ohio and sure enough as I type this it's low to mid 60s (same for tomorrow). My timing was working out perfect until the floor seems to not have dried completely. Throughout the week, it was cold (mid 40s) and very rainy. Only yesterday did it stop raining and today and tomorrow are beautiful (as I mentioned above).
Do I just need to wait longer? Or is something else going on here?
Thanks!
Here's the dirty floor before prep:
Here's when finished and notice the areas that are darker, seemingly not yet dry:
Another view:
Close up:
I had a dehumidifier running during the week and when i changed the placement, it even showed a footprint of the dehumidifier. Weird.