Concrete pad I got some questions

383 240z

Well-known member
Joined
Dec 4, 2006
Messages
4,295
Location
Findley Twp. Allegheny Co.
I'm going to be pouring a small pad and I have a few questions to ask. The pad will be about 6' wide and 10' long. I have 6" from grade to the top of the pad.
It will need to be able to support a max load of 1 ton over a 2'x3' area.

My first thought was to just pour the whole 6" solid with a thick plastic sheeting underneath to block water. Then I thought about putting down some gravel first, then the water barrier and concrete.

Then I got to thinking, this slab will be in the heated portion of the shop, and that I should insulate it from the ground. That got me to consider putting that thick pink foam board down and pouring on top of that. I was hoping that I should use some sort of wire mesh to help with cracking. Still undecided on the finish, I was leaning toward a smooth troweled finish, like my shop has. However I read that if you trowel to early in the cure the top layer could de-laminate. That had me looking at a broom finish. Don't like that as it will trap dirt and chips from the mill.

Not sure what the min size a redi-mix truck will deliver, so I may end up mixing this myself. That means I'll be using one of the many sakrete products.
My first thought would be the 5000 plus high strength mix would be best. Last questionis how cold is to cold to make concrete? Will I have to wait until spring? Any other thoughts? Keith
 
To avoid these ads, REGISTER NOW!

jbbies

Well-known member
Joined
Dec 20, 2009
Messages
92
I just poured some concrete a week ago... Two days later it was around 10 deg. They add calcium out here to help during the winter. I would do a smooth finish for ease of cleaning.
 

pauloman

Banned
Joined
Nov 21, 2012
Messages
141
no info on the pour - but keep in the back of your mind that it will probably not be 'vibrated' after the pour so it will contain a lot of air. Keep this in mind if you ever consider epoxy coating it. If you just roll on the epoxy you may well find thousands of air bubbles the next day..


Paul Oman - MS. MBA
A.K.A. “Professor E. Poxy”
www.epoxyfacts.com
epoxies since 1994
Member: NACE (National Assoc. of Corrosion Engineers) -- SSPC (Soc. of Protective Coatings)
 
To avoid these ads, REGISTER NOW!

rburke65

Well-known member
Joined
Nov 10, 2007
Messages
12,349
Location
Canfield, Ohio
Is this pad being placed inside an existing garage.....this will be for a mill or lathe, if I remember? Is the rest of the garage floor insulated and with a vapor barrier? Installing both of these wont hurt. You can just screed the surface, float it and apply a fine brissle broom finish. Those chips won't get stuck in your floor surface. Call the local ready mix plant and ask them what theminimumdelivery load or charge. You are looking at 1 1/4 yard of concrete. And don't worry about the "ton" of weight on that slab, as the slab will Handel that with out a problem.
 
OP
3

383 240z

Well-known member
Joined
Dec 4, 2006
Messages
4,295
Location
Findley Twp. Allegheny Co.
Yea this is going to be a pad for a mill. I did not mean ton in the figurative sense, I ment the load will equal 2000lbs. The rest of the machine shop floor is PT 2x6's on grade with PT plywood on top. The previous owner was a jack ***. My plan is to replace this section with concrete as time and money allow. Keith
 