44x60 slab to be poured tomorrow, but weather service calls for 50% chance of storms.
The concrete guy says he'll make the call in the morning.
I said I need to sign off before concrete goes on trucks. They didn't like that, but I figure if there is disaster, it'll mainly be my but in the sling.
I'm a bit paranoid, because I want a slick finish and the concrete will be my floor (unlike a house slab that will have flooring).
It it sniffs of any rain, I'm inclined to pull the plug and reschedule.
What do you guys think?
Fred
tulsa
The concrete guy says he'll make the call in the morning.
I said I need to sign off before concrete goes on trucks. They didn't like that, but I figure if there is disaster, it'll mainly be my but in the sling.
I'm a bit paranoid, because I want a slick finish and the concrete will be my floor (unlike a house slab that will have flooring).
It it sniffs of any rain, I'm inclined to pull the plug and reschedule.
What do you guys think?
Fred
tulsa