I have a new concrete slab that was poured on Oct 7th and diamond ground about a week later. I'd like to put down epoxy since it was ground down so much but the nights are already falling into the upper 20's and I'm afraid even after a month it won't be cured enough to take a good coat of epoxy.
Would be a good idea to at least prime after four weeks of cure to get the floor through the winter in good shape and epoxy in the spring or would the primer fail as well?